Gør som tusindvis af andre bogelskere
Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.
Ved tilmelding accepterer du vores persondatapolitik.Du kan altid afmelde dig igen.
This publication provides introductory technical guidance for civil engineers and other professional engineers and construction managers interested in asphalt concrete pavement recycling.
This publication provides introductory technical guidance for civil engineers, mechanical engineers, electrical engineers and other professional engineers, construction managers and power utility operators in sizing of hydroelectric power plants and integrating them into regional electric power systems. Here is what is discussed: 1. INTRODUCTION, 2. PROCEDURE FOR SIZING POWERPLANTS, 3. POWER SYSTEM REQUIREMENTS AND MARKETABILITY, CONSIDERATIONS, 4. PHYSICAL CONSTRAINTS, 5. ENVIRONMENTAL AND NON-POWER OPERATING CONSTRAINTS, 6. SELECTION OF ALTERNATIVE POWER INSTALLATIONS, 7. DEPENDABLE CAPACITY, 8. INTERMITTENT CAPACITY, 9. FLEXIBILITY, 10. MEASURES FOR FIRMING UP PEAKING CAPACITY, 11. HOURLY OPERATION STUDIES
Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.
Ved tilmelding accepterer du vores persondatapolitik.