Markedets billigste bøger
Levering: 1 - 2 hverdage

Construction Scheduling, Cost Optimization and Management

Bag om Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9780415244176
  • Indbinding:
  • Hardback
  • Sideantal:
  • 338
  • Udgivet:
  • 25. januar 2001
  • Størrelse:
  • 156x234x25 mm.
  • Vægt:
  • 703 g.
  Gratis fragt
Leveringstid: 8-11 hverdage
Forventet levering: 17. januar 2025

Beskrivelse af Construction Scheduling, Cost Optimization and Management

This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.

Brugerbedømmelser af Construction Scheduling, Cost Optimization and Management



Find lignende bøger
Bogen Construction Scheduling, Cost Optimization and Management findes i følgende kategorier:

Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.