Udvidet returret til d. 31. januar 2025

Project Scheduling with Time Windows and Scarce Resources

- Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions

Bag om Project Scheduling with Time Windows and Scarce Resources

A survey of the state of the art of deterministic resource-constrained project scheduling with time windows.

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9783540401254
  • Indbinding:
  • Hardback
  • Sideantal:
  • 385
  • Udgivet:
  • 18. juni 2003
  • Udgave:
  • 22003
  • Størrelse:
  • 307x348x26 mm.
  • Vægt:
  • 778 g.
  • BLACK NOVEMBER
  Gratis fragt
Leveringstid: 8-11 hverdage
Forventet levering: 21. november 2024

Beskrivelse af Project Scheduling with Time Windows and Scarce Resources

A survey of the state of the art of deterministic resource-constrained project scheduling with time windows.

Brugerbedømmelser af Project Scheduling with Time Windows and Scarce Resources



Find lignende bøger
Bogen Project Scheduling with Time Windows and Scarce Resources findes i følgende kategorier:

Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.