Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended /

Bag om Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended /

" State Awarded Tw Requirements In 2009 and 2010, requirements at the - On Septemb design and structures to center, peri utility buildin 1 was to co within 27 mo - On Septemb design and existing apa parking facili Contractor 2 State's plans called temporary facilities t entailed acquiring a construction of park partially terminated convenience of the delays. Contractor State transferred co Contractor 2's contr February 2014, whe apartment building those buildings). Co of staff into office a housed them. "

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9781973976530
  • Indbinding:
  • Paperback
  • Sideantal:
  • 38
  • Udgivet:
  • 28. juli 2017
  • Størrelse:
  • 216x280x2 mm.
  • Vægt:
  • 113 g.
Leveringstid: 8-11 hverdage
Forventet levering: 16. december 2024
Forlænget returret til d. 31. januar 2025

Beskrivelse af Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended /

" State Awarded Tw Requirements In 2009 and 2010, requirements at the - On Septemb design and structures to center, peri utility buildin 1 was to co within 27 mo - On Septemb design and existing apa parking facili Contractor 2 State's plans called temporary facilities t entailed acquiring a construction of park partially terminated convenience of the delays. Contractor State transferred co Contractor 2's contr February 2014, whe apartment building those buildings). Co of staff into office a housed them. "

Brugerbedømmelser af Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended /



Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.