Markedets billigste bøger
Levering: 1 - 2 hverdage

Coast Guard

- action needed as approved Deepwater Program remains unachievable: report to congressional committees.

Bag om Coast Guard

"The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide. "

Vis mere
  • Sprog:
  • Engelsk
  • ISBN:
  • 9781974643073
  • Indbinding:
  • Paperback
  • Sideantal:
  • 88
  • Udgivet:
  • 17. august 2017
  • Størrelse:
  • 216x280x5 mm.
  • Vægt:
  • 227 g.
Leveringstid: 8-11 hverdage
Forventet levering: 16. december 2024
Forlænget returret til d. 31. januar 2025

Beskrivelse af Coast Guard

"The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide. "

Brugerbedømmelser af Coast Guard



Gør som tusindvis af andre bogelskere

Tilmeld dig nyhedsbrevet og få gode tilbud og inspiration til din næste læsning.